3. Machine Set Up QD002-07
110 NXT Setup Manual
Signal Cable Connection Diagram (4M Base - Independent 4M Base)
Connect each signal cable as shown in the following diagram.
Do not pass the harness for the vacuum pump box (RH2130*, RH2131*, RH2133*)
through the interior of the base. The harness should be installed along the outside of the
base.
Note: Base connection harness AJ456** are shown in bold.
Dependent
4M base
CN27B
CN27B
CN27A
RH1170*
Left side
module cover
RH0527*
CN28A
To I/F CN27
To HUB CH6
I/O R
RH1187*
BLCN2
BLCN2
RH1188*
Previous stage side
BLCN3
To module 4
Joint harness
RH1325*
BLCN3
BLCN3
BLCN3
BLCN4
To I/F 2 CN9
Panel loading
signal bracket
(Previous stage)
Connected when
shipped
RH0067*
CN-M1
Panel loading
signal bracket
(Next stage)
CN-M2
CN-M1
CN-M2
CN-M2
CN-M2
RH1189*
CN-M2
CN-M2
Lane 2-F
Lane 2-R
RH1186*
Lane 1-F
Lane 1-R
RH1186*
Circuit breaker bracket 1
CN-1
CN-2
RH1190*
M141A
Thermo fuse 2
M141
Inverter bracket
MS3CN3
Inverter bracket
MS3CN1
RH2131*
RH2130*
RH2133*
To I/F CN28
RH2012*
Panel flow
4M Base - 4M Base Harness Connection Diagram (1/2)