QD002-07 3. Machine Set Up
NXT Setup Manual 35
3.4.2 Network Cable
The machine is connected to the host computer by an Ethernet twisted-pair
communication cable (category 5) for the purpose of job transmission and production log
compilation. Depending on the setup of the factory, this can be run at the same time as
the power cable or run with the cables connecting the bases/other machines together.
Procedure
1. Connect one end of the transmission cable to the Ethernet connector to a hub or
network connection, and connect the other end to the connector on the machine.
2. Connect the other end to the Ethernet connector in the machine as shown below.
Ferrite core
NXTSET013Ec
Data transmission cable
(connected to host)
Data transmission cable
Base CPU box