3. Machine Set Up QD002-07
36 NXT Setup Manual
3.4.3 Air supply
Connect an external air supply hose to the machine and adjust the filter regulator to set the
air pressure to the specitied value. This should be performed before leveling in order to
unclamp the modules that are on the base. This does not have to be performed before
leveling if the base has no modules on it.
Procedure
1. Attach a socket to the end of the air supply hose and connect the socket to the air
connector plug of the machine.
2. Turn the air supply lever on so air is supplied to the machine.
3. After power is supplied to the machine, adjust the air supply pressure.
4. Pull up the knob on the filter regulator to unlock it.
5. Turn the knob until the digital pressure gauge reads 0.5 MPa.
Note: The digital pressure gauge is located at the front of the base
6. Push down the knob to lock it.
Note: Fuji does not supply the hose.
WARNING
When working with a module pulled out and the cover over the air
supply connection is off, ensure that no one pushes in the module.
If pushed in while body parts are in the opening, the module may
pinch, sever, or cause serious injury.
Air inlet
Digital pressure gauge
Socket for 3/8" hose
0.5 MPa or more
Hose
20PM plug
Lever
Knob
NXTSET005Eb