● For 2U
Figure 36 OFF Position (Marked "¡") of the Main Line Switches on a 2U Power Distribution Unit
Figure 37 OFF Position of the Main Line Switches on a 2U Power Distribution Unit
When turning the main line switch to ON (marked "|") right after turning the main line switch to OFF (marked
"¡"), turn it back to ON (marked "|") after the POWER LED of the power supply unit has turned off completely.
2.
Basic Operation
Powering On and Off
35
FUJITSU Storage ETERNUS DX60 S4, ETERNUS DX60 S3 Hybrid Storage Systems Operation Guide (Basic)
Copyright 2018 FUJITSU LIMITED
P3AM-9012-08ENZ0