EasyManua.ls Logo

Fujitsu ETERNUS LT20 S2 - Solaris OS Device Recognition

Fujitsu ETERNUS LT20 S2
118 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
38 ETERNUS LT20 S2
Operator Control Panel (OCP) Operating the LTO Library
4.1.6 Power ON/OFF
Part of the Operator Control Panel is the Power On/Off button. Pressing this
button will initiate a controlled Power Down of the unit (soft landing). The
following operations will take place before the unit shuts down completely:
The display indicates with an appropriate message that the shutdown is in
progress.
The library controller finishes all ongoing library and drive activities.
The robot is moved to its home position.
The library controller switches off the power supply's secondary side.
To abort the shutdown process the user has to press Cancel within the first
3 seconds.

Table of Contents

Other manuals for Fujitsu ETERNUS LT20 S2

Related product manuals