EasyManua.ls Logo

GE AKTAprocess User Manual

GE AKTAprocess
180 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
GE Healthcare
Life Sciences
ÄKTAprocess™
Operating Instructions
Original instructions

Table of Contents

Other manuals for GE AKTAprocess

Questions and Answers:

GE AKTAprocess Specifications

General IconGeneral
BrandGE
ModelAKTAprocess
CategoryLaboratory Equipment
LanguageEnglish

Summary

Introduction

About this manual

Defines the manual's purpose, scope, and typographical conventions.

Important user information

Crucial information before operating, intended use, and prerequisites for safe use.

Regulatory information

Details manufacturing, CE, international, additional, and environmental compliance.

Safety instructions

Safety precautions

Covers general, personal, installation, power, and operational safety measures.

Labels

Explains the meaning of various system and safety labels found on the equipment.

Emergency procedures

Details steps for emergency shutdown, power failure response, and system restart.

System description

Configurations

Summarizes standard/optional components, tubing, and cabinet types.

Illustrations of ÄKTAprocess

Provides front and rear views of standard and optional system configurations.

Standard components

Details on structural, control, inlets/outlets, meters, pump, air trap, and valves.

UNICORN control system

Describes software modules, workflow, manual instructions, indicators, and alarms.

Installation

Site requirements

Details requirements for space, floor load, ambient environment, power, and air supply.

Transport

Provides guidelines for transporting the system in crate and when unpacked.

ÄKTAprocess Setup

Covers assembly, control system setup, connections, and column connection procedures.

Power supply

Details power requirements, UPS, grounding, circuit breakers, and cable specifications.

Operation

Prepare the system

Steps for starting system/software, preparing components, testing, and final checks.

Perform a run

Instructions for starting, monitoring, and ending a system run.

Shut down the system and software

Procedures for safely shutting down the system and the UNICORN software.

Maintenance

User maintenance schedule

Lists weekly, monthly, and annual maintenance tasks for system components.

Cleaning

Procedures and recommendations for cleaning, including CIP and sanitization.

Storage

Provides procedures for short-term and long-term storage of the system.

Calibration of pH probe

Details required equipment and steps for calibrating the pH probe.

Troubleshooting

System

Addresses common system problems like PC connection and power failure.

Pump

Troubleshooting for pump not working, low flow, or high outlet pressure.

UV curve

Symptoms and corrective actions for issues with UV signals or drift.

Reference information

Specifications

Contains general technical data, cabinet/system specs, and temperature/pressure limits.

Chemical resistance

Lists allowed exposure times and concentrations for various chemicals.

UNICORN method for system CIP/Sanitization/Rinsing

Provides an example UNICORN method for system cleaning procedures.

Related product manuals