EasyManua.ls Logo

GE Druck DPI612 - Hydraulic Operations Overview

GE Druck DPI612
105 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
User Manual Druck DPI612
Page 46 of 105 [EN] English – 109M4017 Revision -
2.2.3 Release pressure DPI 612 pFlexPro (100 bar pump)
Open the refill
valve fully
counter-clockwise
Open the pressure
release valve
counter-clockwise
(1 turn)
1 2
DPI 612 hFlexPro (1000 bar) HYDRAULIC OPERATIONS. 2.3
PRESSURIZED GASES AND FLUIDS ARE DANGEROUS. BEFORE
CONNECTING OR DISCONNECTING PRESSURE EQUIPMENT, SAFELY
RELEASE ALL THE PRESSURE.
ENSURE THAT THE SYSTEM IS BLED OF EXCESS AIR BEFORE
OPERATION. (IF THE ITEM UNDER TEST HAS A LARGE VOLUME,
PRE-FILL WITH THE PRESSURE FLUID TO ENSURE THAT TRAPPED
AIR IS KEPT TO A MINIMUM).
To prevent damage to the pressure station, do not let dirt get into
the pressure mechanism. Before connecting equipment, make
sure it is clean.
Ice in the pressure mechanism can cause damage. If the
temperature is less than 4°C (39°F), drain all water from the
instrument.

Table of Contents

Related product manuals