GE
D
IRECTION 5535208-100, REV. 2 LOGIQ E9 SERVICE MANUAL
Chapter 8 Replacement procedures 8 - 13
8-4-6-4 System Software Load - R3 and earlier (cont’d)
12.)Choose one of the following:
a.) Select [1] ONLY if a [2] update cannot be used: Selecting [1] performs a complete LOGIQ E9
software installation. (All data will be erased.)
b.) Select [2] to update/re-install the software on the C:\ partition. (Only data on the C:\ partition
will be erased. This will keep Patient Archive and Presets intact.) On R2.x.x or later, C:\ and
Z:\ partitions will be reloaded. Archive and presets are not affected.
c.) Select [3] to Exit.(The procedure exits without software load.)
Depending on the choice, a message displays explaining choice again. This is the last
warning message prior to software load. Press CTRL-C to abort.
With choice [1] or [2], the Software loader program launches.
The Norton Ghost window displays.
13.)Wait for the software installation to complete. (Typical installation time: 5-10 minutes). Status bar
on the screen indicates progress.
The Base Load Complete message displays. See: NOTICE below.
Figure 8-5 Norton Ghost window
Do not interrupt the software loading at any time.
Figure 8-6 Base Load Complete message
DO NOT proceed with the Application Software load yet.
DO NOT insert the Application disk into the DVD drive until you have completed all the remaining
directions in this section. If you insert media in the drive beforehand, the drives will not remap correctly.
If there are no error messages listed above, the “Base System Software Load Image” process has successfully com-
pleted. You will now need to load the “Application Software” onto your system.
Please remove the CDROM from the drive, power cycle the system and then continue with the “Application Software”
load procedure.