GE
D
IRECTION 5535208-100, REV. 2 LOGIQ E9 SERVICE MANUAL
8 - 128 Section 8-6 - Replacing Top Console Parts
8-6-5-4 Functional Test
Perform the following functional checks to confirm the system is operational before returning the system
to the customer.
If all are successful, include the following debrief script: LOGIQ E9 Service Manual, Direction
5535208-100, Rev. 2. Equipment passed all required checks and is ready for use.
Table 8-82 WLAN replacement instructions Functional Checks
See:
Section Functional Check Debrief Script
4-2-2 Power ON/Boot Up
LOGIQ E9 Service Manual, Direction
5535208-100, Rev. 2. Equipment passed all
required checks and is ready for use.
4-2-3 Power shut down
4-3-5 B-Mode Checks
4-3-7 System CFM and PWD Checks
4-3-10 Basic Measurements