Combustion Inspection — Reassembly ProceduresInspection and Maintenance — GEK 107048
CI-R-9
Figure CI-R.6. Transition Piece First-Stage Nozzle to Retaining Ring Clearance Checks.
Transition
Piece
Nozzle
See Standard Practice Section 2
Approx. 5 in.
0.160
0.090
1.0 in.
0.200 Typ.
70°
3/16 in. Thru Hole
1/2
(X)1
(X)2
3(X)
4(X)
5(X)
(X)6
0.090
0.160
0.090
0.160
in.
Special Tools in This Manual