EasyManua.ls Logo

GE MS-6001B - Perform Hot Gas Path Disassembly

GE MS-6001B
370 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Inspection and Maintenance — GEK 107048Major Inspection — Disassembly Procedures
MI-D-26
4. Unbolt and remove the top half of the number two bearing exhaust baffle.
5. Unbolt and remove the bearing strap and upper half bearing liner.
6. Cover the open bearing housing to protect the rotor bearing journal.
7. Wrap the removed liner for protection, identify and tag all parts for reassembly.
Operation 18 — Perform Hot Gas Path Disassembly Operations 18 and 19
Note: Refer to the Hot Gas Path Inspection section, in this Service Manual for
the following disassembly operations.
1. Remove upper half second and third stage nozzle radial retaining pins.
2. Remove upper half second and third stage nozzle segments.

Table of Contents

Related product manuals