EasyManua.ls Logo

GE MS-6001B - Page 71

GE MS-6001B
370 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Standard PracticesInspection and Maintenance — GEK 107048
SP-45
MS-6001B DLN-1 — Combustion Inspection Recommended Spare Parts (Cont’d)
Recommended
Quantity
PIPING ARRANGEMENT COOLING AND SEALING AIR (ML0909) (Cont’d)
14. Connector, Male 2
15. Connector, Male 10
16. Connector, Tube Female 1
17. Elbow, Union 3
18. Elbow, Union 2
19. Elbow, Union 7
20. Union, Tube 2
21. Union, Tube 4
22. Union, Tube 7
23. Tee, Tube Union 2
24. Nut, Self Locking *5
25. Nut, Self Locking *6
26. Nut, Self Locking *6
THERMOCOUPLES, EXHAUST AND TRIP (ML0623)
1. Exhaust and Trip Thermocouples 16
RING RETAINING TURBINE NOZZLE FIRST STAGE (ML1401)
1. Insert, Wire Locking (Helicoil) 4
2. Insert, Wire Locking (Helicoil) 9
3. Wire, Insert (Helicoil) 30
4. Wire, Insert (Helicoil) 1
MS-6001B DLN-1
Hot Gas Path Inspection
Recommended Spare Parts
Note: Refer to your Parts Volume of this Service Manual to obtain the proper
drawing and/or part number for the material listed under each ar-
rangement or assembly drawing.
Recommended
Quantity
PRIMARY FUEL NOZZLE ASSEMBLY (ML0513)
1. Tip Assembly (Gas) 50

Table of Contents

Related product manuals