Standard PracticesInspection and Maintenance — GEK 107048
SP-45
MS-6001B DLN-1 — Combustion Inspection Recommended Spare Parts (Cont’d)
Recommended
Quantity
PIPING ARRANGEMENT COOLING AND SEALING AIR (ML0909) (Cont’d)
14. Connector, Male 2
15. Connector, Male 10
16. Connector, Tube Female 1
17. Elbow, Union 3
18. Elbow, Union 2
19. Elbow, Union 7
20. Union, Tube 2
21. Union, Tube 4
22. Union, Tube 7
23. Tee, Tube Union 2
24. Nut, Self Locking *5
25. Nut, Self Locking *6
26. Nut, Self Locking *6
THERMOCOUPLES, EXHAUST AND TRIP (ML0623)
1. Exhaust and Trip Thermocouples 16
RING RETAINING TURBINE NOZZLE FIRST STAGE (ML1401)
1. Insert, Wire Locking (Helicoil) 4
2. Insert, Wire Locking (Helicoil) 9
3. Wire, Insert (Helicoil) 30
4. Wire, Insert (Helicoil) 1
MS-6001B DLN-1
Hot Gas Path Inspection
Recommended Spare Parts
Note: Refer to your Parts Volume of this Service Manual to obtain the proper
drawing and/or part number for the material listed under each ar-
rangement or assembly drawing.
Recommended
Quantity
PRIMARY FUEL NOZZLE ASSEMBLY (ML0513)
1. Tip Assembly (Gas) 50