EasyManua.ls Logo

GE MS-6001B - Page 73

GE MS-6001B
370 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Standard PracticesInspection and Maintenance — GEK 107048
SP-47
MS-6001B DLN-1 — Hot Gas Path Inspection Recommended Spare Parts (Cont’d)
Recommended
Quantity
TRANSITION PIECE ARRANGEMENT COMBUSTION (ML0717)
1. Seal, Aft-Side, Combustion Transition Piece 10
**2. Bolt, Shoulder (Transition Piece Aft Mounting Bracket) 20
**3. Lockplate (Transition Piece Aft Mounting Bracket) 20
**4. Bolt, Shoulder (Transition Piece Forward Mounting Bracket) 20
**5. Lockplate (Transition Piece Forward Mounting Bracket) 10
**6. Lockplate (Transition Piece Forward Mounting Bracket) 10
**7. Lockplate (Transition Piece Seal Retainer) 10
**8. Bolt, Shoulder (Transition Piece Seal Retainer) 10
LINER ASSEMBLY COMBUSTION (ML0703)
1. Cap and Liner Assembly 10
TRANSITION PIECE ASSEMBLY, COMBUSTION (ML0702)
1. Transition Piece Assembly 10
CASING, COMBUSTION ARRANGEMENT (ML0719, 0708, 0701)
1. Outer Combustion Case, Cover Bolts *48*
SPARK PLUG ASSEMBLY (ML1214)
1. Igniter Assembly 1
2. Base Assembly (Spark Plug) 1
**3. Gasket 2
ULTRAVIOLET FLAME DETECTOR ASSEMBLY (ML1121)
1. Ultraviolet Flame Detector 2

Table of Contents

Related product manuals