WP21 Series Operation Manual Chapter 3 Installation
12
If the outer package is intact, please open the packaging box and
check the items in the box at the presence of the distributor or Genrui
personnel:
1) Verify if all the components are equipped according to the packing
list.
2) Carefully check the appearance of all the components to verify
whether there is breakage, crash or deformity.
3.4 Packing list
Please check the Packing List in the instrument packaging box.
3.5 Installation requirements
Content
Requirements
Location
Flat tabletop with a tilt of < 1/200 and sufficient
intensity, which can bear the weight of 50kg;
Dust-free, without corrosive and inflammable
gases, free from heat or wind sources and
mechanical vibration;
Avoidance of direct sunlight and with good
ventilation
Space
Enough space to place the analyzer with the area
of at least 1m
2
Temperature
10-30
Humidity
Relative humidity ≤ 70%
Atmospheric
pressure
70.0kPa-106.0kPa
Ventilation
Able to exchange air with the external environment,
smooth air flow, not directly blowing into the

Table of Contents