3.6 Instrument Installation
1) Open the special packaging box of this analyzer and carefully
verify if the instrument and accessories in the box are consistent with
the packing list. If there is any loss or damage, please contact the
supplier at once.
2) If the articles in the box are correct, take out the instrument
carefully and put it on the stable and flat workbench.
3) Ground the grounding rod at the rear panel of this analyzer via an
earth wire specially designed for medical instruments (grounding
impedance < 0.1Ω).
4) Take out the power cable, plug one end into the power jack at the
rear panel and insert the other end into the grounded three-wire
socket.
5) The fuse used for this instrument is indicated as “F3AL250V”,
which is a type of glass-tube rapid-fusing device with double-cap
lead wires and has 3A of the rating current and 250V of the rating
voltage.
6) If the analyzer should be connected with the Laboratory
Information System (LIS) or Hospital Information System (HIS), take
out the serial port cable and connect one end to COM RS232 at the
instrument rear and the other end to the computer. The serial port is
set according to the instructions of LIS or HIS
7) For a device not permanently connected, please do not place it
at a location that is hard to disconnect.