EasyManua.ls Logo

Gilson GX-271 - Aspirate and Dispense Sequences

Gilson GX-271
126 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation
3
3-8 Gilson GX-271 Liquid Handler User’s Guide
Aspirate and Dispense Sequences
Aspirate and Dispense Sequences
Aspirating Fluid from a Well
Aspirate sequence:
1 The selection valve on the solvent system switches to waste (position 1)
2 The solvent system starts moving, aspirating fluid from the well. The fluid in the transfer tubing is dispensed to waste.
Figure 3-8: Aspirate Sequence
Dispensing Fluid to a Well
Dispense sequence:
1 The selection valve switches to reservoir (positions 2–6).
2 The solvent system starts moving, dispensing fluid to the well. The fluid is aspirated from reservoir.
Figure 3-9: Dispense Sequence
to waste
from
well
from
reservoir
to
well

Table of Contents