EasyManua.ls Logo

Haier AB072MRERA - Page 175

Haier AB072MRERA
651 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
167
Convertable Type
Indoor Unit
3. Floor Type Installation
Fix four rubber feet to the bottom of the unit with *4×16 bolts and Φ12
spacers (applicable to oor type units only).
According to gure on the right, choose a certain direction to lead out drain
pipe; drain holes are available on both right and left sides; practical
conditions shall be considered. After deciding upon the directions to lead
out pipelines, wires and drain pipes, drill wall holes according to required
drilling processes.
Install wall mount rack according to gure below.
Installing Drain Pipe
In case of model 22-140, x drain pipes to drain holes on left and right sides (as shown in gure 4 and gure 5).
Install as follows (see gure below):
Plug drain pipe in water pan in the first place, as shown by figure, then, bind the two tight together and tie up
junction area with heat insulant.
Figure 4 Model AC092-242MCERA Figure 5 Model AC282-482MFERA
Model AC092-242MCERA
Heat Insulant

Table of Contents

Related product manuals