7
Before starting
Installation Operation
Screen block
diagram
Function setting Program System setting Specifications
▶Control
1) How to install DIN rail
①
Connect the top hook(A) of bottom of
floor to the DIN rail and press it(B) in
order to install it.
②
Check if it is fixed by pushing
up the mounting bracket.
Ⓑ
Ⓐ
TH510 series module can connect up to 7 units. Any module must be installed vertically.
TM
-
DO
ADR
PWR
RY2
RY6
RY1
RY5
RY3
RY7
RY4
RY8
TM
-
DO
ADR
PWR
RY2
RY6
RY1
RY5
RY3
RY7
RY4
RY8
TM
-
DO
ADR
PWR
RY2
RY6
RY1
RY5
RY3
RY7
RY4
RY8
TM
-
DO
ADR
PWR
RY2
RY6
RY1
RY5
RY3
RY7
RY4
RY8
TM
-
DO
ADR
PWR
RY2
RY6
RY1
RY5
RY3
RY7
RY4
RY8
TM
-
DO
ADR
PWR
RY2
RY6
RY1
RY5
RY3
RY7
RY4
RY8
●
How to install module
②
Fix a module on
both ends using
stoppers.
TM
-
DO
ADR
PWR
RY2
RY6
RY1
RY5
RY3
RY7
RY4
RY8
TM
-
DO
ADR
PWR
RY2
RY6
RY1
RY5
RY3
RY7
RY4
RY8
TM
-
DO
ADR
PWR
RY2
RY6
RY1
RY5
RY3
RY7
RY4
RY8
TM
-
DO
ADR
PWR
RY2
RY6
RY1
RY5
RY3
RY7
RY4
RY8
TM
-
DO
ADR
PWR
RY2
RY6
RY1
RY5
RY3
RY7
RY4
RY8
TM
-
DO
ADR
PWR
RY2
RY6
RY1
RY5
RY3
RY7
RY4
RY8
③
①
Push a module aside
in order to connect it to a
connector.
هﺮﮐ ﮓﻧﺎﯿﻧﺎﻫ تﻻﻮﺼﺤﻣ یرﺎﺼﺤﻧا هﺪﻨﯾﺎ ناﻮﯿﺳ ﺖﮐﴍ