5 - Operation
5.4
Folding one side only (HZ Hydraulics only)
If only one side of the boom is to be used for spraying, first unfold the boom completely and then turn switches off. Then
activate the switch for the side that is to be folded and activate the double acting outlet to fold that side into transport
position.
ATTENTION! It is not advisable to go directly from transport position to spray position with one side only. Both
wings must first be completely unfolded and then one side folded back in.