EasyManua.ls Logo

HBM MP85 - 2 Commissioning

HBM MP85
56 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
10
PME-MP85
A08973.4 enHBM
2 Commissioning
To prepare the MP85 measurement system for a measurement task, the
following conditions must be met or the relevant steps taken:
You need a PME module MP85 or MP85DP and the PME Assistant,
including software
The hardware must be configured (transducer, device, PC with the
software) (from Page 16)
The PME Assistant software must be installed (from Page 18)
To connect the PME module to a PC, you need a CAN adapter (from Page
17)
PCAN parallel interface LPT to CAN or
PCAN USB to CAN or
PCAN card (PCI or ISA) to CAN
The PME module must be connected to the CAN adapter
Once you have started the software, you can set up the PME module with
the PME Assistant (Online Help) (Page 19)

Related product manuals