EasyManua.ls Logo

HeartWare HVAD Pump - HVAD Pump Explant

HeartWare HVAD Pump
158 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
121Surgical Implant and Explant of the HVAD® Pump
10
9
8
7
6
5
4
3
2
1
Appendix
Reference
Guides
Alarms and
Emergencies
Patient
Management
Surgical
Implant and
Explant
Monitor
Peripherals
and
Accessories
HVAD
®
PumpOverviewIntroduction
6.5 HVAD
®
Pump Explant
At Transplant
1. Surgically expose the HVAD
®
Pump and sewing ring.
2. Place patient on cardiopulmonary bypass according to institutional guidelines.
3. Connect the controller to the monitor and turn off the HVAD
®
Pump.
4. 
5. 
6. Cut and remove the percutaneous driveline.
7. Remove the HVAD
®
Pump with the heart.
Myocardial Recovery/ Pump Exchange
1. Surgically expose the HVAD
®
Pump and sewing ring.
2. Place patient on cardiopulmonary bypass according to institutional guidelines.
3. Connect the controller to the monitor and turn off the HVAD
®
Pump.
4. 
5. 
6. Cut and remove the percutaneous driveline.
WARNING! At HVAD
®
Pump explant the percutaneous driveline is not sterile; therefore ensure that the

7. 
8. Use the sewing ring wrench to loosen the sewing ring screw.
9. Remove the HVAD
®
Pump.
NOTE: During HVAD
®


necessary to excise tissue adjacent to the sintering potentially resulting in bleeding and/or air emboli.
10. For pump exchange, refer to “Left Ventricle (LV) Apex Cannulation” in section 6.4, “Surgical
Implant Procedure” (starting at step #6). For myocardial recovery, follow the steps below.
11. Repair the hole in the LV.
12. Close sternum and skin incision per routine.
13. Once HVAD
®

14. Place HVAD
®
Pump in 5% Formaldehyde for at least 2 days.
15. Allow the HVAD
®
Pump to thoroughly dry.
16. Follow the packaging instructions provided in the Explant Kit (provided by HeartWare)
and return the HVAD
®
Pump in the Explant Kit.
HeartWare, Inc.
Quality Assurance Department
14400 NW 60th Avenue
Miami Lakes, FL 33014 USA

Table of Contents