23
2
Preparing for Measurement
2.1 Preparation Process
Before starting, read “Operating Precautions” (p. 7) carefully.
For more information about rack mounting, see “Appx. 7 Rack Mounting” (p. Appx.14).
(1) Position the instrument as desired. (p. 7).
(2) Perform the pre-measurement inspection. (p. 24).
(3) Connect the power cord. (p. 25).
(4) Connect the measurement cables to the measurement terminals. (p. 26).
(5) Connect the temperature sensor to the TEMP.SENSOR connector.
(When performing temperature measurement or using the temperature compensation function) (p. 27)
(6) Congureandconnecttheexternalinterface(asnecessary).
• Using the USB interface. (p. 98)
• Using the RS-232C interface. (p. 100)
• Using the GP-IB interface. (p. 102)
• Using the LAN interface. (p. 104)
• Using a USB ash drive (p. 115)
• Using the EXT I/O connector (p. 125)
(7) Turn on the instrument. (p. 28).
(8) Set the time and date. (p. 30).
2 Preparing for Measurement
Power cord To outlet
2
Preparing for Measurement
w ww . . co m
information@itm.com1.800.561.8187