Operating Mode Selection
© 2016 Hirschmann Automation and Control GmbH · Mobile Machine Control Solutions · www.beldensolutions.com 11/57
qSCALE i2 Cranes (Tool Version 3.0.34) Operators Manual / Issue B / 11-2017 / ac.
If first switched on or the system was switched off for longer than three hours the following screen
appears:
Follow the instructions in Section 2.2.1 to adjust the RCL to the current rigging state of the
crane.
If the system is restarted again within 3 hours, the last configuration screen is displayed.
The system awaits confirmation or re-entry of the settings (Example):
Only if the crane configuration has not been changed since the RCL was last setup,
press the
key to confirm the displayed operation mode.
If the configuration does not match the saved selection follow the instructions in Section
2.2.1 to adjust the RCL to the current rigging state of the crane.