3 1 Storage or FC switches
2 Storage or FC switches
3 Storage or FC switches
4 Storage or FC switches
4 0 Customer facing management network
5 1 Private management Ethernet network
5. If cables are not labeled, label them befor
e removing them from the server.
6. Remove all cables from the server, and remove the server from the rack.
7. Remove the rail mounts from the old server, and install them on the new server.
8. Remove the battery from the old server, and install it in the new server.
9. Remove the bezel from the old server, and install it on the new server.
10. Insert the new server into the rack, and connect the power cords to the power
supplies.
Note: Do not make any other cable connections at this time.
Configuring the replacement servers
Before you begin
Obtain the necessary IP addr
esses to be used for the replacement server. Servers
shipped from the factory have not yet had the nas-precong script run on them, so a
r
eplacement server will not have any IP addr
esses pre-congured for your use. You need
IP addresses for the following:
■
Eth1 (cluster IP)
■
Eth1 (testhost private IP)
■
Eth0 (testhost external IP)
■
192.0.2.200/24 eth1 (cluster IP)
■
192.0.2.2/24 eth1 (testhost private IP)
■
192.168.4.120/24 eth0 (testhost external IP, which might vary)
On a replacement server:
Conguring the replacement servers
Appendix A: Server replacement procedures