This step requires a separate process, training, and license keys. Contact Hitachi
V
antar
a if the incorrect model arrives for replacement.
11. Navigate to Home > SMU Administration > Upgrade SMU to verify and, if
necessary, upgrade the embedded SMU to the latest SMU release.
12. Navigate to Home > Server Settings > Firmware Package Management to verify
and, if necessary, upgrade the new server to the latest SU release.
13. Navigate to Home > Server Settings > Conguration Backup & Restore, select the
desired backup le, and click restore to restore the system from that backup le.
14. Reboot the server.
15. Reconnect the data cables to the server.
Finalizing and verifying the replacement server configuration
The Fibr
e Channel (FC) link speed varies according to the server model. Use the
appropriate speed for your model.
Model Fibre Channel link speed
HNAS 4040 4 Gbps
HNAS 4060, 4080, and 4100 8 Gbps
On the replacement server:
Note: The following steps show the FC link speed as 8 Gbps as an example.
Finalizing and verifying the replacement server conguration
Appendix A: Server replacement procedures
Hitachi NAS Platform and Hitachi Unied Storage Series 4000 Hardware Reference 97