Revision 10 ST 800 SmartLine Pressure Transmitters User’s Manual Page 9
3.4.3 Bracket Mounting Procedure
If you are using an optional bracket, start with Step 1. For an existing bracket, start with Step 2.
1. Refer to Figure 5. Position the bracket on a 2-inch (50.8 mm) horizontal or vertical pipe, and
install a “U” bolt around the pipe and through the holes in the bracket. Secure the bracket
with the nuts and lock washers provided.
Figure 5 – Angle Mounting Bracket Secured to a Horizontal or Vertical Pipe
2. Align the appropriate mounting holes in the Transmitter with the holes in the bracket. Use the
bolts and washers provided to secure the Transmitter to the bracket; see the following
variations.
DP with double-ended process
heads and/or remote seals
Alternate mounting holes in the ends of
the heads
In-line GP and AP (STGxxL and
STAxxL)
The smaller “U” bolt provided to attach the
meter body to the bracket. See the
following example.
Mounting holes in the end of the process
head.
EXAMPLE: Inline model mounted to an optional angle bracket. See Figure 6.
Horizontal Pipe
Mounting
Bracket
Nuts and
Lockwashers
Nuts and
Lockwashers
U-Bolt
U-Bolt
Mounting
Bracket
Vertical Pipe