• LS ISCSI_LUN FULL
For more information about using the utility or using the CAPTURE commands, see the HP StorageWorks
Storage System Scripting Utility Reference. See “Required documentation” on page 10 for the link to
this document.
Task checklist
Use the following checklist to track your progress and mark when a task has been completed. You
can initial and timestamp task completion if you like.
Table 5 XCS 6.220 Pre-upgrade task checklist
Task completeTask
Checking current controller software version
Time required: About 5 minutes
When to perform: Any time before starting to upgrade your controller software.
Checking current software versions, page 13
Time required: 10–15 minutes
When to perform: Any time prior to the upgrade
Checking the storage system hardware, page 15
Time required: 15–20 minutes
When to perform: 1–2 weeks prior to the upgrade, and then daily until the
upgrade is complete. Provide enough time to order and replace any failed
components.
Checking and upgrading your SAN infrastructure, page 17
Time required: After collecting and evaluating data on your configuration over
several weeks, a determination can be made regarding the appropriate time to
do the upgrade.
When to perform: Any time prior to the upgrade
Managing application I/O timeouts for an online upgrade, page 33
Time required: Varies depending on number of applications
When to perform: Any time prior to the upgrade
Back up all storage system data, page 34
Time required: Varies
When to perform: As close as possible to the upgrade
Upgrading HP Command View EVA, page 34
Time required: 15–20 minutes
When to perform: Any time prior to the upgrade
Upgrading browser and Java Runtime Environment (JRE), page 36
Time required: 10–20 minutes
When to perform: Any time prior to the upgrade
Pre-upgrade tasks42