EasyManuals Logo

HP ProLiant ML110 G7 Maintenance And Service Guide

HP ProLiant ML110 G7
96 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #24 background imageLoading...
Page #24 background image
Removal and replacement procedures 24
Avoid hand contact by transporting and storing products in static-safe containers.
Keep electrostatic-sensitive parts in their containers until they arrive at static-free workstations.
Place parts on a grounded surface before removing them from their containers.
Avoid touching pins, leads, or circuitry.
Always be properly grounded when touching a static-sensitive component or assembly.
Server warnings and cautions
Before installing a server, be sure that you understand the following warnings and cautions.
WARNING: To reduce the risk of electric shock or damage to the equipment:
Do not disable the power cord grounding plug. The grounding plug is an important safety
feature.
Plug the power cord into a grounded (earthed) electrical outlet that is easily accessible at all
times.
Unplug the power cord from the power supply to disconnect power to the equipment.
Do not route the power cord where it can be walked on or pinched by items placed against it.
Pay particular attention to the plug, electrical outlet, and the point where the cord extends from
the server.
WARNING: To reduce the risk of personal injury from hot surfaces, allow the drives and the
internal system components to cool before touching them.
CAUTION: Do not operate the server for long periods with the access panel open or removed.
Operating the server in this manner results in improper airflow and improper cooling that can
lead to thermal damage.
Removing the access panel
WARNING: To reduce the risk of personal injury from hot surfaces, allow the drives and the
internal system components to cool before touching them.
CAUTION: For proper cooling, do not operate the server without the access panel, baffles,
expansion slot covers, or blanks installed. If the server supports hot-plug components, minimize
the amount of time the access panel is open.
1. Power off the server if performing a non-hot-plug installation or maintenance procedure ("Power down
the server" on page 23).
2. Unlock and open the front bezel.
3. Remove the thumbscrew on the access panel.
4. Slide the access panel back.
5. Lift the access panel to remove it.
Installing the access panel

Table of Contents

Other manuals for HP ProLiant ML110 G7

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the HP ProLiant ML110 G7 and is the answer not in the manual?

HP ProLiant ML110 G7 Specifications

General IconGeneral
Product TypeServer
Form FactorTower
Processor Sockets1
ChipsetIntel C202
Memory TypeDDR3 UDIMM
Maximum Memory16 GB
Memory Slots4
ProcessorIntel Xeon E3-1200 series
StorageSAS or SATA
Drive Bays4 LFF or 8 SFF
Hard DrivesOptional
Optical DriveOptional
Network ControllerHP NC112i Gigabit Ethernet Adapter (1 port)
Operating System SupportMicrosoft Windows Server, Red Hat Enterprise Linux, SUSE Linux Enterprise Server
Storage ControllerHP Dynamic Smart Array B120i

Related product manuals