EasyManua.ls Logo

HP ProLiant ML30 Gen9 - Installing a Tape Drive Option

HP ProLiant ML30 Gen9
110 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
13. Install a front PCI fan.
14. Install the air baffle.
15. Install the access panel.
16. Install the bezel.
17. Return the server to an upright position.
18. Connect the power cord to the power source and the server.
19. Power up the server.
Installing a tape drive option
For more information about product features, specifications, options, configurations, and compatibility, see the
product QuickSpecs on the Hewlett Packard Enterprise website.
Procedure
1. Back up all server data.
2. Power down the server.
3. Disconnect the power cord from the power source and the server.
4. Remove the bezel.
5. Place the server on its side with the access panel facing up.
6. Remove the access panel.
7. Remove the air baffle.
8. Remove the EMI shield.
Installing a tape drive option 53

Table of Contents

Other manuals for HP ProLiant ML30 Gen9

Related product manuals