EasyManua.ls Logo

HP ProLiant ML30 Gen9 - Installing a Four-Bay LFF Hot-Plug Drive Cage Option

HP ProLiant ML30 Gen9
110 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
10. Close the PCIe slot cover retainer.
11. Connect one end of the SATA cables to the enablement board and connect the other end to the SATA
connectors on the system board.
Port 1 connects to SATA 5 and port 2 connects to SATA 6.
12. Install the air baffle.
13. Install the access panel.
14. Install the bezel.
15. Return the server to an upright position.
16. Connect the power cord to the power source and the server.
17. Power up the server.
Installing a four-bay LFF hot-plug drive cage option
For more information about product features, specifications, options, configurations, and compatibility, see the
product QuickSpecs on the Hewlett Packard Enterprise website.
Installing a four-bay LFF hot-plug drive cage option 57

Table of Contents

Other manuals for HP ProLiant ML30 Gen9

Related product manuals