Hardware options installation 62
12.
Remove all bezel blanks.
13. Install the drives ("Drive option" on page 72, "Drive option" on page 73).
14. Install blanks in unused drive bays.
15. Connect each power cord to the server.
16. Connect each power cord to the power source.
17. Power up the server ("Powering up the server" on page 24).
Express Bay enablement option
CAUTION: To prevent damage to electrical components, take the appropriate anti-static
precautions before beginning any system installation. Improper grounding can cause
electrostatic discharge.