a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
3. Disconnect all peripheral cables from the server.
4. Do one of the following:
If the server is in tower mode: Place the server on its side with the access panel facing up.
If the server is in rack mode, do one of the following:
Extend the server from the rack.
Remove the server from the rack.
5. Remove the front bezel.
6. While pressing the latch on the EMI shield, pull out the blank from the bay.
To replace the component, insert the tab on the blank into the slot on the media bay.
Removing and replacing the dedicated iLO port blank
Procedure
1. Power down the server.
2. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
3. Disconnect all peripheral cables from the server.
4. Do one of the following:
If the server is in tower mode: Place the server on its side with the access panel facing up.
If the server is in rack mode, do one of the following:
Extend the server from the rack.
Remove the server from the rack.
5. Remove the front bezel.