EasyManua.ls Logo

Huawei FusionServer Pro XH321 V5 - Page 91

Huawei FusionServer Pro XH321 V5
186 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Figure 8-48 Position of the TPM
Step 6 Take the component out of its ESD bag.
Step 7 Remove the PCIe riser module.
For details, see 8.4.21 Removing a PCIe Riser Module.
Step 8 Install M.2 SSDs.
For details, see 8.4.2 Installing an M.2 SSD.
Step 9 Install the TPM.
1. Align the TPM with the dowel pins on the side wall of the server node, and
insert the TPM in the arrow direction.
FusionServer Pro XH321 V5 Server Node
Maintenance and Service Guide 8 Parts Replacement
Issue 17 (2021-03-09) Copyright © Huawei Technologies Co., Ltd. 82

Table of Contents

Related product manuals