EasyManua.ls Logo

Huawei FusionServer Pro XH321 V5 - Removing and Installing XH321 V5 Server Node

Huawei FusionServer Pro XH321 V5
186 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
a. Log in to the iBMC WebUI.
For details, see 10.2 Logging In to the iBMC WebUI.
b. Choose Power > Power Control.
The Power Control page is displayed.
c. Click Power
O or Forced Power O.
A conrmation message is displayed.
d. Click OK.
The server starts to be powered o.
Use the iBMC CLI.
a. Log in to the iBMC CLI.
For details, see 10.4 Logging In to the CLI.
b. Run the following command:
ipmcset -d powerstate -v 1
c. Type y or Y and press Enter.
Use the Remote Virtual Console.
a. Log in to the Remote Virtual Console.
For details, see 10.3 Logging In to the Desktop of a Server.
b. On the KVM screen, click
or on the toolbar.
c. Choose Power O or Forced Power O.
A dialog box is displayed.
d. Click Yes.
8.3.3 Removing an XH321 V5
Procedure
Step 1 Determine the position of the server node in the chassis.
Figure 8-2 Positions and slot numbers of the XH321 V5 server nodes
Step 2 Power o the server node.
For details, see 8.3.2 Power-O Procedure.
Step 3 Remove the multi-port cable.
1. Press the two tabs on the multi-port cable connector. See (1) in Figure 8-3.
2. Remove the multi-port cable from the universal connector port (UCP) on the
server. See (2) in Figure 8-3.
FusionServer Pro XH321 V5 Server Node
Maintenance and Service Guide 8 Parts Replacement
Issue 17 (2021-03-09) Copyright © Huawei Technologies Co., Ltd. 44

Table of Contents

Related product manuals