Figure 5-13 Removing the protective cover
Step 2 Remove the bae plates for the signal cables.
Figure 5-14 Removing the
bae plates for the signal cables
Step 3 Connect the FE communications cables to the WAN ports on the CMU.
LUNA2000-2.0MWH-1H0, 2H0 Smart String ESS
User Manual 5 Installing Cables
Issue 02 (2021-11-15) Copyright © Huawei Technologies Co., Ltd. 98