Figure 4-11 Installing the PSU
----End
4.3.2 Installing Copper Bars Between Battery Packs
Prerequisites
● The battery cabin door is open.
● The ESS is not powered on.
Procedure
Step 1 Take out the copper bars from the battery cabin.
Remove the desiccants from the battery cabin and dispose of them in accordance with the
applicable local disposal act for waste.
LUNA2000-2.0MWH-1H0, 2H0 Smart String ESS
User Manual 4 Installation
Issue 02 (2021-11-15) Copyright © Huawei Technologies Co., Ltd. 81