6 Checking Before Power-On
Item No. Check Item Acceptance Criteria
Gene
ral
inspe
ction
1 Equipment appearance The equipment is intact and free from
rust or paint ake-o. If paint akes o,
repaint the equipment.
The labels on the equipment are clear.
Damaged labels must be replaced.
2 Cable appearance Cable sheathings are properly wrapped
and not damaged.
Cable hoses are intact.
3 Cable connections Cables are connected in the designed
positions.
Terminals are prepared as required and
securely connected.
Labels on both ends of each cable are
clear and
specic, and attached in the
same direction.
4 Cable layout Electrical and ELV cables are routed
separately.
Cables are neat and tidy.
Cable tie joints are evenly cut without
burrs.
Cables are placed properly and reserve
some slack at bending points to avoid
stress.
Cables are routed neatly without twists
or crossovers in the cabinet.
5 Switch The DC LV Panel switch is set to OFF.
The battery rack switch is set to OFF.