Proced
ure
Item Remarks
7 Powering o the Distribution
Transformer (Huawei or non-Huawei
equipment)
Corresponding to number 7,
8, and 9 in the power-o
owchart
9.2 Delivering a Shutdown Command on the
SmartLogger
Prerequisites
The system has connected to the grid and is running properly.
Procedure
Step 1 Log in to the SmartLogger WebUI, choose Maintenance > Connect Device, and
click
to shut down the Smart PCS and Smart Rack Controller.
Figure 9-3 Shutdown command
Step 2 Choose Device Monitoring > PCS > > Running Info.. Check the device status,
active power, and DC voltage to verify that the shutdown is successful.
Step 3 Choose Device Monitoring > CMU > > Running Info.. Check the rated power and
total output voltage of the
rectier to ensure that the shutdown is successful.
Step 4 Choose Overview > Active Alarms to view system alarms generated after the
shutdown. If any alarm is generated, handle the alarm according to the alarm
handling suggestions.
----End
LUNA2000-2.0MWH-1H0, 2H0 Smart String ESS
User Manual 9 Powering O the System
Issue 02 (2021-11-15) Copyright © Huawei Technologies Co., Ltd. 131