Figure 7-2 Power-on process of LUNA2000-2.0MWH-2H0
● Check the equipment before power-on. For details, see the corresponding user
manual.
● Before the
rst power-on, check that cables are correctly connected.
● Incorrect cable connections may cause damage to the STS or the Smart PCS.
Verify the cable connections between the STS and the Smart PCS for the initial
power-on. If any exception occurs during the power-on process, stop the
operation. You can proceed with the operation only after the exception has
been handled.
Pro
ced
ure
Item Remarks
1 Powering on the STS (including the STS Auxiliary
Transformer)
Corresponding
to number 1,
number 2, and
number 3 in the
power-on
owchart
2 Powering On the Smart Array Controller (SACU) Corresponding
to number 4 in
the power-on
owchart
LUNA2000-2.0MWH-1H0, 2H0 Smart String ESS
User Manual 7 Powering On the System
Issue 02 (2021-11-15) Copyright © Huawei Technologies Co., Ltd. 107