Step 4 Switch on all circuit breakers of the ESS power distribution system.
1. Switch on the AC power circuit breakers of the air conditioner in sequence.
(corresponding to number 1 in the gure)
– LUNA2000-2.0MWH-1H0: Switch on the circuit breakers 3FCB1, 3FCB2,
3FCB4, 3FCB5, 3FCB7, 3FCB8, 3FCB10, 3FCB11 in sequence.
– LUNA2000-2.0MWH-2H0: Switch on the circuit breakers 3FCB2, 3FCB4,
3FCB6, 3FCB8, 3FCB10, 3FCB12 in sequence.
2. Switch on UPS circuit breaker 5FCB
a
, ESS adapter circuit breaker 5FCB1,
lighting system circuit breaker 1FB1, 220/230 V socket circuit breaker 1FB2 in
sequence. (corresponding to number 2 in the 
gure)
a: The UPS connection terminal is reserved in the ESS. Switch 5FCB is the input switch
of the UPS (if connected), which is the upper-level switch of the adapter switch 5FCB1
and the re control panel switch 5FCB3.
3. Switch on the re control panel circuit breaker 5FCB3 (corresponding to
number 2 in the 
gure), Open the re control panel and turn on the two
power switches inside.
Figure 7-6 Position of the power switch in the re control panel
(1) Position of the right power switch
in the re control panel
(2) Position of the left power switch
in the re control panel