Figure 5-8 Connecting the live wire and neutral wire from the lower end
of the switch
●
Installing a 220 V socket
Connect the live wire (corresponding to cable 1756) and neutral wire
(corresponding to cable 1759) from the lower end of the switch to positions 1
and 3 of the XT1 terminal block.
Figure 5-9 Connecting the live wire and neutral wire from the lower end of
the switch
Step 3 Connect the live wires (corresponding to cables 1757 and 1763) and neutral wires
(corresponding to cables 1760 and 1765) from the lower end of the terminal block
to the socket.
Steps 3 and 4 apply to the scenarios where a 220 V or 110 V socket is installed. The
following gure uses a 220 V socket as an example.
LUNA2000-2.0MWH Series Smart String ESS
User Manual 5 Installing Cables
Issue 08 (2022-11-15) Copyright © Huawei Technologies Co., Ltd. 118