EasyManua.ls Logo

Huawei LUNA2000-2.0MWH Series - Page 127

Huawei LUNA2000-2.0MWH Series
264 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Figure 5-6 Before installing the socket
(1) Cable binding position
Step 1 Select a 110 V or 220 V socket as required.
Step 2 Connect the live wire and neutral wire.
Installing a 110 V socket
a. Connect the live wire and neutral wire from the mains to positions 1 and
2 of the XT9 terminal block.
Figure 5-7 Connecting the live wire and neutral wire from the mains
b. Connect the live wire (corresponding to cable 1751) and neutral wire
(corresponding to cable 1752) from the lower end of the switch to
positions 1 and 3 of the XT1 terminal block.
LUNA2000-2.0MWH Series Smart String ESS
User Manual 5 Installing Cables
Issue 08 (2022-11-15) Copyright © Huawei Technologies Co., Ltd. 117

Table of Contents

Other manuals for Huawei LUNA2000-2.0MWH Series

Related product manuals