Figure 7-19 Securing the battery pack
Step 7 Install the battery pack in the ESS.
Dummy battery packs have been preinstalled in the 97 kWh, 129 kWh, and 161 kWh ESSs
to separate air channels and must not be removed.
Figure 7-20 Installing the battery pack in the ESS
Step 8 Secure the battery pack.
LUNA2000-(97KWH-1H1, 129KWH-2H1,
161KWH-2H1, 200KWH-2H1) Smart String ESS
User Manual 7 Installation