9 Powering On the ESS
9.1 Check Before Power-On
9.1.1 General Check
No.
Check Item Expected Result
1 Appearance The equipment is intact and free from rust or paint
ake-o. If the paint akes o, repair the damaged
paint.
The labels on the device are clear. Damaged labels
must be replaced.
2 Cable
appearance
Cable sheathings are properly wrapped and not
damaged.
Cable hoses are intact.
3 Cable
connection
Cables are connected in the designed positions.
Terminals are prepared as required and securely
connected.
Labels on both ends of each cable are clear and
specic, and attached in the same direction.
4 Cable
routing
Electrical and extra low voltage (ELV) cables are
routed separately.
Cables are neat and tidy.
Cable tie joints are evenly cut without burrs.
Cables are placed properly and with slack at bending
points to avoid stress.
Cables are routed neatly without twists or crossovers
in the cabinets.
5 Battery pack
copper bar
The copper bar is not deformed, and the plastic dip
coating is not damaged.
LUNA2000-(97KWH-1H1, 129KWH-2H1,
161KWH-2H1, 200KWH-2H1) Smart String ESS
User Manual 9 Powering On the ESS