EasyManua.ls Logo

Huawei LUNA2000-97KWH-1H1 - Preparing Cables

Huawei LUNA2000-97KWH-1H1
209 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CA UTION
When connecting batteries, ensure that the spring washer on the screw is
leveled, that the protruding part of the terminal on the cable faces outwards,
and that the cable is intact.
Do not connect two or more cables to the positive or negative power port of a
battery in parallel.
Stay away from the equipment when preparing cables to prevent cable scraps
from entering the equipment. Cable scraps may cause sparks and result in
personal injury and equipment damage.
NO TE
The cable colors shown in the electrical connection diagrams provided in this section are for
reference only. Select cables in accordance with local cable specications. (Green-and-
yellow cables are only used for protective earthing.)
8.1 Preparing Cables
NO TE
The cable diameter must comply with local cable standards. The factors that aect cable
selection include the rated current, cable type, routing mode, ambient temperature, and
maximum expected line loss.
Name
Type Conducto
r Cross-
Sectional
Area
Outer
Diameter
Terminal Source
Ground cable for
the rack controller
Single-core
outdoor copper
cable
≥ 25 mm
2
- M6 OT/DT
terminal
Prepared
by the
customer
DC power cable Prefabricated DC
power cable (with
a corrugated pipe)
- - - Delivered
with the
product
Auxiliary AC power
cable (with
external grid power
supply)
Two-core (L, N)/
Three-core (L, N,
PE) outdoor
copper/copper-clad
aluminum/
aluminum alloy
cable
6–25 mm
2
12.7–27 mm Cord end
terminal with
an insertion
depth of 12
mm, M8
OT/DT
terminal
Prepared
by the
customer
LUNA2000-(97KWH-1H1, 129KWH-2H1,
161KWH-2H1, 200KWH-2H1) Smart String ESS
User Manual 8 Installing Cables
Issue 10 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd. 105

Table of Contents

Related product manuals