8.10 (Optional) Installing Maintenance Socket Cables
The actual appearance of the maintenance socket may vary. The gure shows only the
installation method.
Figure 8-23 Connecting cables
8.11 Sealing Cable Holes
After cables are installed, seal the cable holes using the delivered sealing putty.
Figure 8-24 Sealing putty
LUNA2000-(97KWH-1H1, 129KWH-2H1,
161KWH-2H1, 200KWH-2H1) Smart String ESS
User Manual 8 Installing Cables
Issue 10 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd. 126