No. Check Item Expected Result
6 Switch ● The DC LV Panel switch is set to OFF.
● The battery rack switch is set to OFF.
9.1.2 ESS Installation Check
Cabinet
No. Check Item Expected Result
1 Installation ● The installation meets the design
requirements.
● The cabinet is level, and each door
opens normally.
2 Appearance The cabinet surface is free from cracks,
dents, and scratches. If the paint akes
o, repair the damaged paint.
3 Cabinet grounding Each cabinet has at least two ground
points and is grounded securely. The
resistance of a bond shall be less than
or equal to 0.1 ohms.
4 Accessory The number and positions of external
accessories installed meet design
requirements.
5 Label All labels are correct, clear, and
complete.
Interior
No.
Check Item Expected Result
1 Circuit breaker The circuit breakers are OFF.
2 Copper bar The copper bars are not deformed, and
there are no foreign objects on the
copper bars.
3 Cable The bolts for installing the cables are
tightened and the cables are not loose.
4 Cable hole sealing Cable holes are sealed.
5 Battery pack All battery packs are intact.
LUNA2000-(97KWH-1H1, 129KWH-2H1,
161KWH-2H1, 200KWH-2H1) Smart String ESS
User Manual 9 Powering On the ESS
Issue 10 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd. 128