Figure 7-33 Securing the Smart PCS
----End
7.4.5 (Optional) Installing a Maintenance Socket
Context
The 220 V socket is prepared by the customer. The actual socket appearance may
vary. This section describes only the installation method.
Procedure
Step 1 Remove the bae plate in front of the power distribution area.
Step 2 Install the maintenance socket.
Figure 7-34 Installing the socket
----End
LUNA2000-(97KWH-1H1, 129KWH-2H1,
161KWH-2H1, 200KWH-2H1) Smart String ESS
User Manual 7 Installation
Issue 10 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd. 102