EasyManua.ls Logo

Huawei LUNA2000-97KWH-1H1 - Page 109

Huawei LUNA2000-97KWH-1H1
209 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Figure 7-28 Removing bound cables
Step 5 Install the upper bracket, lower bracket, rainproof canopy, and lifting handles to
the rack controller.
NO TE
The upper bracket, lower bracket, rainproof canopy, and lifting handles are delivered
with the product.
The screws for securing the upper and lower brackets are preinstalled on the rack
controller. Remove the screws before installing the upper and lower brackets.
The screws for securing the rainproof canopy are preinstalled on the upper bracket.
Remove the screws before installing the rainproof canopy.
When using the lifting handles, hold the handle end closer to the device.
Figure 7-29 Installing mounting kits
LUNA2000-(97KWH-1H1, 129KWH-2H1,
161KWH-2H1, 200KWH-2H1) Smart String ESS
User Manual 7 Installation
Issue 10 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd. 99

Table of Contents

Related product manuals