Parameter Description
PV adjustment
step
[1]
This parameter is displayed after Adaptive
adjustment parameters is set to Disable.
You can set this parameter based on site
requirements. In this case, the PV rise step
for PV+ESS equalization is the preset value.
Start time Set the start time and end time of charge
and discharge. A maximum of 14 time
segments can be set. You can set a cycle by
week by clicking the buttons corresponding
to Mon. through Sun. in the Repeat box.
The buttons are blue by default, indicating
being selected. After you click it, the button
turns gray.
End time
Charge/
Discharge
Repeat
TOU
(xed
power)
Start time Set the start time, end time, and power of
charge and discharge. A maximum of 14
time segments can be set. You can set a
cycle by week by clicking the buttons
corresponding to Mon. through Sun. in the
Repeat box. The buttons are blue by
default, indicating being selected. After you
click it, the button turns gray.
End time
Charge/
Discharge
Charge/
Discharge
power (kW)
Repeat
Charge/
Discharge
based on
grid
dispatch
Adaptive
adjustment
parameters
[1]
Set the adjustment period and step
parameters for raising the inverter power.
Enable: The adjustment period and step
set in the SmartLogger are used.
Generally, the adjustment period and
step are calculated based on the number
of devices connected to the port and
device specications.
Disable: Use this value based on site
requirements.
Adjustment
period
[1]
This parameter is displayed after Adaptive
adjustment parameters is set to Disable.
You can set this parameter based on site
requirements. In this case, battery control is
performed based on the preset period.
PV adjustment
step
[1]
This parameter is displayed after Adaptive
adjustment parameters is set to Disable.
You can set this parameter based on site
requirements. In this case, the PV rise step
for PV+ESS equalization is the preset value.
LUNA2000-(97KWH-1H1, 129KWH-2H1,
161KWH-2H1, 200KWH-2H1) Smart String ESS
User Manual 10 Commissioning the ESS (SmartLogger WebUI)
Issue 10 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd. 150

Table of Contents

Related product manuals